CERTIFICATE OF COMPLIANCE.  


Latest version.
  • Before release of any subdivision or re-subdivision bond, or before the Commission endorses any subdivision or re-subdivision map to permit filing with the Town Clerk, the Commission may require the applicant to present a statement, signed and sealed by a land surveyor or engineer, fully licensed in the State of Connecticut, certifying such surveyor or engineer has inspected the required construction work and that all of the required improvements have been completed in accordance with plans and Town specifications as approved, such certification to be reviewed by the Town Engineer. The Commission may require a performance bond to remain in effect during a maintenance period of two years commencing with the date the Commission accepts the subdivision improvements and recommends acceptance of same by the Town Council as Town public highways. The amount of such maintenance bond shall be 10% of the original bonded amount.