§ 5. ACTIVITIES REGULATED BY THE STATE  


Latest version.
  • 5.1 
    In addition to any permit or approval required by the Commission, the Commissioner of Environmental Protection shall regulate activities in or affecting wetlands or watercourses subject to the following jurisdiction:
    A. 
    Construction or placement of any obstruction within stream channel encroachment lines pursuant to Sections 22a-342 through 22a-349 of the General Statutes, as amended.
    B. 
    Diversion of water, including withdrawals of surface or groundwater in excess of 50,000 gallons per day or any piping, culverting, channelization, relocation, damming or other alteration of the location of flow of any surface waters of the state where the tributary watershed area above the point of diversion is 100 acres or larger pursuant to Sections 22a-365 through 22a-378a of the General Statutes, as amended.
    C. 
    Discharges into the waters of the state pursuant to Section 22a-430 of the General Statutes, as amended.
    5.2 
    The Commissioner of Environmental Protection shall have exclusive jurisdiction over regulated activities in or affecting wetlands or watercourses, undertaken by any department, agency or instrumentality of the State of Connecticut, except any local or regional board of education pursuant to Sections 22a-39 or 22a-45a of the Connecticut General Statutes, as amended.
    5.3 
    The Commissioner of Environmental Protection shall have exclusive jurisdiction over tidal wetlands designated and regulated pursuant to Sections 22a-28 through 22a-35 of the General Statutes, as amended.
    5.4 
    The Commissioner of Environmental Protection shall have exclusive jurisdiction over activities authorized under a dam repair or removal order issued by the Commissioner of Environmental Protection under Section 22a-402 or a dam construction permit issued by the Commissioner of Environmental Protection under Sections 22a-403 of the Connecticut General statutes. Any person receiving such dam repair or removal order or dam construction permit shall not be required to obtain a permit from a municipal wetlands agency for any action necessary to comply with said dam order or to carry out the activities authorized by said dam permit.
    5.5 
    The Commissioner of Environmental Protection shall have exclusive jurisdiction over the Discharge of fill or dredged materials into the wetlands and watercourses of the state pursuant to Section 401 of the Federal Clean Water Act, as amended, for activities regulated by the U.S. Army Corps of Engineers under Section 404 of the Federal Clean Water Act.
    Editor's Note: See 33 U.S.C. § 1251 et seq.