New Milford |
Code of Ordinances |
Part I. Charter and Related Laws |
Part II. Code of Ordinances |
Chapter 22. Water, Sewers and Sewage Disposal |
Article II. Sewers and Sewage Disposal |
Division 1. Generally |
§ 22-23. Application for and issuance of permits; fees.
Latest version.
-
The Director of Health shall prepare application forms and shall prepare and issue permits required by §§ 22-21 and 22-22 or by the Connecticut Public Health Code to qualified applicants.(a)For the initial installation of private sewage disposal systems for new construction of buildings, the Director of Health shall charge the following fees:(1)Single-family, multiple-family and commercial and/or industrial buildings:a.Sewage disposal system permit: $250.b.Soil testing fee for deep hole and percolation tests: $100.c.Engineered plan review fee, per lot: $200.(b)For the repair or replacement of private sewage disposal systems for existing construction, the Director of Health shall charge the following fees:(1)Single-family, multiple-family and commercial and/or industrial buildings:a.Sewage disposal system permit: $125.b.Septic tank only: $75.c.Soil testing fee: none.d.Engineered plan review fee: none.(c)For the review of sewage disposal and water supply system plans for feasibility for subdivisions referred to the Director of Health through the New Milford Planning Commission:(1)Proposed subdivisions of lots for the purpose of single-family, multiple-family and commercial and/or industrial buildings:a.Each lot: $100.(d)For inspection and approval of food service establishments, see Chapter 6C.(e)For the review and approval of the private sewage disposal system for additions and/or renovations to buildings, the Director of Health shall charge the following fees:(1)Single-family, multiple-family and commercial and/or industrial buildings:a.Approval requiring a site inspection: $75.(f)For the review and approval of each water supply well permit, the Director of Health shall charge the following fees:(1)New well (each): $100.(2)Redrill, deepen or hydrofracture of existing well or well abandonment (each): $25.(g)For the annual relicensing of day-care centers, the Director of Health shall charge the following fees:(1)Day-care centers licensed for 12 or more children: $100.
Ord. of 7-22-1965, § II; Ord. of 4-24-1969; Ord. of 7-1-1969; Ord. of 6-2-1977; Ord. of 1-10-1983; Ord. of 6-3-2002; Ord. of 9-24-2007; Ord. of 9-11-2017