§ 22-51.2. Conformance with other rules.  


Latest version.
  • The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench and connection of the building sewer to the public sewer shall all conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the Town of New Milford. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the American Society for Testing and Materials and Water Pollution Control Facility Manual of Practice No. 9 shall apply.
11-22-1983, § 21